The existing factory area is equipped with a complete set of production lines for aluminum alloy die-casting, spraying, metalworking, motors, assembly, and packaging. The new factory area is expected to start production in January 2027, with a total construction area of 96800 square meters. After completion, the annual production capacity can reach 2.68 million electric tools.